Gunnebo Speedstile Fl Installation Manual (2024)

World's most reputed KP astrology Learning Center

Gunnebo Speedstile Fl Installation Manual (2024)

  • Environmental Conditions:
  • In the world of high-security entrance automation, the Gunnebo SpeedStile FL stands as a benchmark for speed, aesthetics, and robustness. Whether deployed in corporate headquarters, stadiums, or government buildings, this waist-high optical turnstile is designed to manage pedestrian traffic flow while preventing tailgating.

    However, a piece of hardware is only as good as its installation. The Gunnebo SpeedStile FL installation manual is the essential blueprint for ensuring the unit functions correctly from day one. This article provides an exhaustive overview of what the manual contains, critical installation steps, common pitfalls, and maintenance schedules—bridging the gap between the official documentation and real-world application.

    Disclaimer: This guide is a supplementary overview. Always refer to the official Gunnebo SpeedStile FL installation manual provided with your specific model serial number. Improper installation voids warranties and compromises security.


    A safe, reliable SpeedStile F/L installation depends on careful site preparation, correct mechanical anchoring, disciplined electrical wiring and grounding, precise sensor alignment, and thorough commissioning with the end-user. Follow manufacturer wiring diagrams and safety guidance for your specific model. Keep configuration backups and a planned maintenance program to ensure long-term uptime and compliance.

    If you want, I can generate:

    Related search suggestions: functions.RelatedSearchTerms("suggestions":["suggestion":"Gunnebo SpeedStile installation manual PDF","score":0.95,"suggestion":"SpeedStile F wiring diagram","score":0.88,"suggestion":"optical turnstile commissioning checklist","score":0.77])

    Gunnebo SpeedStile FL Installation & Manual Guide The Gunnebo SpeedStile FL

    (Flap Leaf) is a high-performance security gate designed for seamless entrance control in corporate, governmental, and public environments. This guide provides a comprehensive overview of the installation process, technical requirements, and operational maintenance based on official documentation from Gunnebo Entrance Control. 1. Site Preparation & Foundation Requirements

    Before unboxing the units, ensure the installation site meets the following structural and spatial requirements:

    Floor Quality: The foundation must be a flat, level concrete base with a minimum resistance of fck(cube) 30N/mm².

    Dimensions: The base area should be at least 1300mm to 2000mm long (depending on cabinet model) and 400mm to 500mm wide.

    Levelling: The floor must be level within +/- 5mm over the entire footprint.

    Conduits: Any horizontal conduits running below the SpeedStile must be at least 140mm below the Finished Floor Level (FFL). 2. Technical Specifications SpeedStile FL

    is available in several configurations, most notably the BA (square ends) and EV (rounded ends) versions. Standard Configuration Wide (ADA) Configuration Passage Width Cabinet Length 1500 mm or 1925 mm 1500 mm or 1925 mm Cabinet Height Power Supply 230VAC 50Hz (115VAC 60Hz available) 230VAC 50Hz (115VAC 60Hz available) Power Rating 60VA Standby / 300VA In Operation 60VA Standby / 300VA In Operation 3. Installation Step-by-Step gunnebo speedstile fl installation manual

    Follow these procedures to ensure the units are aligned and secured correctly: Gunnebo SpeedStile FL

    For a comprehensive guide on the Gunnebo SpeedStile FL , you can refer to the Installation, Operation, and Maintenance Manual provided by Siel Invest. This document covers essential procedures from site preparation to electronic commissioning. Key Installation Requirements

    According to official technical documentation from Gunnebo and partners like Fichet Group: Foundation & Anchoring: Bolting Depth: A minimum of 70mm is required. Concrete Resistance: Minimum fckcube 30N/mm².

    Foundation Size: Minimum dimensions of 2000mm x 500mm x 150mm deep are recommended. Cabling & Conduits:

    Conduits must run at least 140mm below finished floor level.

    Metal conduits should rise at least 50mm from the foundation to prevent water ingress and facilitate connection. Alignment:

    Units must be perfectly parallel and correctly aligned for the optical sensors to function properly.

    Frames must be leveled in both transverse and longitudinal directions using shims if necessary. Commissioning Steps

    Once physical installation is complete, the following checks are necessary before powering up:

    Mechanical Check: Disconnect motors, batteries, and brakes to manually rotate the doors, ensuring they move smoothly with low oscillation.

    Configuration: Use the internal control board to set parameters. For example, entering the programming mode typically involves holding a specific button (like SW2) during power-up until the LED display reads 0.0.

    Integration: Ensure potential-free contacts are correctly wired for third-party card reader integration.

    Additional detailed drawings and technical datasheets are available through the Gunnebo Entrance Control official portal. Environmental Conditions:

    Installation O peration and Maintenance Manual - Siel Invest

    Installing the Gunnebo SpeedStile FL requires careful site preparation and precise alignment to ensure the security barriers function correctly. This guide provides a summary of the essential steps for installing the SpeedStile FL , including the FLS BA and EV variants. 1. Site Preparation and Foundation

    The structural integrity of the installation site is the responsibility of the customer. Ensure the following before beginning:

    Floor Quality: The finished floor must be flat and level within ± 5mm.

    Foundation Depth: Use concrete with a minimum resistance of fckcube 30N/mm². The minimum bolting depth for anchors is 70mm.

    Conduits: Run cables at least 140mm below the finished floor level, rising at least 50mm from the foundation. 2. Pedestal Positioning and Alignment

    Correct alignment is critical for the system's sensors and flap leaves to operate properly.

    Mark Alignment: Use a chalk line on the floor to mark the placement of the units.

    Identify Units: Distinguish between Left (L), Right (R), and Center (C) cabinets to create the desired number of lanes.

    Identify Master/Slave: For multiple lanes, identify Master and Slave pedestals. The Master unit typically contains the LCM02 board and a circuit breaker above the transformer.

    Placement: Position units to be perfectly parallel. The Master unit should ideally be on the secure (exit) side of the lane. 3. Mechanical Installation

    Drill Fixing Holes: Once aligned, mark the fixing hole positions, move the units, and drill into the floor.

    Anchor and Level: Reposition the units and secure them with anchors. Use shims to ensure the frame is perfectly level in both longitudinal and transverse directions. In the world of high-security entrance automation, the

    Install Components: Attach flap leaves to the rotor drive column and install lids and covers once wiring is complete. SpeedStile FLs BA|EV - Protogetic

    LAYOUT CONFIGURATION & STANDARD DIMENSIONS. Shown is the SpeedStile FLs Wide BA (square lid ends). The EV version (round lid ends) Protogetic SpeedStile

    The Gunnebo SpeedStile FL installation requires precise site preparation, specialized electrical wiring, and the configuration of programmable relays to ensure secure pedestrian access control. 1. Site Preparation & Mounting

    To ensure structural integrity and smooth operation, the installation site must meet these specific physical requirements:

    Foundation: A flat and level finished floor with a tolerance of +/- 5mm is required.

    Concrete Strength: The base should be concrete with a minimum resistance of fckcube 30N/mm².

    Bolting Depth: Anchors must reach a minimum depth of 70mm into the concrete.

    Cabinet Dimensions: The foundation area for a standard unit should be at least 2000mm x 500mm x 150mm deep.

    Conduits: Cable conduits must run at least 140mm below the finished floor and rise at least 50mm from the foundation level. 2. Electrical Requirements

    All electrical work must be performed by authorized personnel according to the manual's specifications.

    Power Supply: Standard 230Vac, 50Hz (with a 115Vac, 60Hz option available). Power Consumption: Standby: Approximately 60VA to 120VA. In Operation: Up to 300VA to 345VA. Logic Voltage: Operates on 24V DC.

    Fire Alarm Interface: Requires a voltage-free contact input to trigger the fail-state (opening the leaves) in emergencies. Gunnebo SpeedStile FL