Hb-eatv 800 Manual [Top-Rated | WORKFLOW]

  • Deposition: Monitor the source material. As it melts, adjust the current to maintain a stable evaporation rate. Monitor the deposition rate using a quartz crystal monitor (QCM).
  • | Problem | Possible cause | Solution | |-----------------------|----------------------------------------|------------------------------------| | Motor does not run | No power, limit switch engaged | Check outlet & cord; reset switch | | Lifts but won’t lower | Faulty down contactor or limit switch | Service by electrician | | Load drifts down | Brake worn or oily | Clean/replace brake | | Slow lifting | Overload or low voltage | Reduce load; check supply voltage | | Remote not working | Broken wire in pendant | Replace pendant cord |

    The front panel typically contains the following elements: hb-eatv 800 manual