Tower Crane Dismantling Method Statement File

| Role | Responsibility | |------|----------------| | Appointed Person (AP) | Overall planning, risk assessment, method statement approval, lifting plan sign-off. | | Crane Supervisor | Supervise dismantling activities, ensure lift plan followed, stop unsafe acts. | | Tower Crane Operator (during dismantling) | Operate crane for last lifts if powered, then vacate cabin safely. | | Mobile Crane Operator | Operate assist crane for lowering mast sections, jib, counter-jib, slew unit. | | Riggers / Slinger Signallers | Attach slings, guide loads, communicate with crane operators. | | Ground Support Team | Receive and lay down components, secure against rolling. | | Safety Officer | Monitor compliance with PPE, exclusion zones, and permit-to-work. |

Before any bolt is loosened or section lifted, a thorough pre-dismantling audit must be completed and documented. tower crane dismantling method statement

| Role | Name (Example) | Responsibility | |------|----------------|----------------| | Project Manager | J. Smith | Overall authority; ensures resources are available. | | Appointed Person (AP) | R. Jones | Plans the operation; issues the lift plan; holds authority to stop work. | | Crane Supervisor | T. Brown | Directs the dismantling crew; manages communication; checks weather. | | Tower Crane Operator | M. Lee | Operates the tower crane during lowering of components; shuts down crane. | | Mobile Crane Operator | D. Clark | Operates the auxiliary mobile crane (e.g., 200-tonne all-terrain). | | Riggers / Dogmen | Team of 4 | Attach slings, guide loads, disconnect pins/bolts. | | Safety Officer | S. Grey | Monitors compliance; enforces exclusion zones. | | | Mobile Crane Operator | Operate assist