Verified | Primavera P6 Pdf Tutorial

Do not skip the database login section.

A verified tutorial begins at the very start: connecting to the P6 database (either the SQLite standalone or an Oracle server). It should explain the difference between the PMDB (Project Management Database) and the MMDB (Metadata Database). primavera p6 pdf tutorial verified

Step 3.1: Create the Project

Step 3.2: Define the Work Breakdown Structure (WBS) Do not skip the database login section

  • Note: Activities (tasks) cannot be created until a WBS node exists.
  • Step 3.3: Adding Activities (Tasks)

    Step 3.4: Creating Relationships (Logic) P6 requires logic to calculate dates. Do not manually type dates unless it is a constraint. Step 3